Project: 10708 El Jahuel Solar Power Project, Chile - Request for post-registration changes
Project 10708 El Jahuel Solar Power Project, Chile
PRC ref PRC-10708-001
Process track Issuance
DOE KSA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Decrease in the capacity
Applicable crediting period 11 Mar 22 - 10 Mar 29
Assessment opinion Assessment opinion (849 KB)
Revised PDD Revised PDD (2450 KB)   Revised PDD - track changes (2452 KB)
Supplementary documents
Signed form Signed form (150 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 02 Aug 23 - Request published