Project: 1404 “35 MW Bagasse Based Cogeneration Project” by Mumias Sugar Company Limited (MSCL) - Request for post-registration changes
Project 1404 “35 MW Bagasse Based Cogeneration Project” by Mumias Sugar Company Limited (MSCL)
PRC ref PRC-1404-001
Process track Prior approval
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Oct 2008 - 30 Jun 2011

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Oct 08 - 30 Sep 18
Assessment opinion Assessment opinion (598 KB)
Revised PDD Revised PDD (2728 KB)   Revised PDD - track changes (1677 KB)
Supplementary documents Appendix 1 - Avant feasibility rpt.pdf (209 KB)
Appendix 2 - Avant_MSCL_contract.pdf (160 KB)
Appendix 3 - bosch feasibility rpt.pdf (167 KB)
Signed form Signed form (1864 KB)
DOE clarification
VVS version VVS 2.0
Current status 20 Aug 13 - Approved
Effective approval date: 14 Aug 13
Historic statuses 16 Jul 13 - Published
16 Jul 13 - Summary note being prepared
24 Jul 13 - Awaiting EB decision