Project:
1404 “35 MW Bagasse Based Cogeneration Project” by Mumias Sugar Company Limited (MSCL)
- Request for post-registration changes
| Project | 1404 “35 MW Bagasse Based Cogeneration Project” by Mumias Sugar Company Limited (MSCL) |
|---|---|
| PRC ref | PRC-1404-001 |
| Process track | Prior approval |
| DOE | BVI |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 01 Oct 08 - 30 Sep 18 |
| Assessment opinion |
Assessment opinion (598 KB)
|
| Revised PDD |
Revised PDD (2728 KB)
Revised PDD - track changes (1677 KB)
|
| Supplementary documents |
Appendix 1 - Avant feasibility rpt.pdf (209 KB)
Appendix 2 - Avant_MSCL_contract.pdf (160 KB)
Appendix 3 - bosch feasibility rpt.pdf (167 KB)
|
| Signed form |
Signed form (1864 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 20 Aug 13 -
Approved
Effective approval date: 14 Aug 13
|
| Historic statuses |
16 Jul 13 -
Published 16 Jul 13 - Summary note being prepared 24 Jul 13 - Awaiting EB decision |