Project: 3378 Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León. - Request for post-registration changes
Project 3378 Landfill Gas Recovery and Flaring Project in the El Verde Landfill, León.
PRC ref PRC-3378-002
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 27 Oct 2017 - 31 Dec 2018
Assessment opinion Assessment opinion (977 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (279 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 04 Aug 20 - Rejected
Effective rejection date: 03 Aug 20. The reason for rejection can be viewed as part of the final ruling for the associated request for issuance.
Historic statuses 24 Apr 20 - Request published