Project: 3335 Trang Palm Oil Wastewater Treatment Project in Trang Province, Thailand - Request for post-registration changes
Project 3335 Trang Palm Oil Wastewater Treatment Project in Trang Province, Thailand
PRC ref PRC-3335-001
Process track Issuance
DOE JQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 08 Dec 2010 - 30 Sep 2013

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 08 Dec 10 - 07 Dec 20
Assessment opinion Assessment opinion (191 KB)
Revised PDD Revised PDD (2078 KB)   Revised PDD - track changes (2361 KB)
Supplementary documents Appendix 1 - Addendum spreadsheet (2x1.063MW scenario).xls (118 KB)
Signed form Signed form (67 KB)
DOE clarification
VVS version VVS 2.0
Current status 23 Apr 15 - Approved
Effective approval date: 23 Apr 15
Historic statuses 25 Mar 15 - Request published