Project: 0107 BII NEE STIPA - Request for post-registration changes
Project 0107 BII NEE STIPA
PRC ref PRC-0107-001
Process track Prior approval
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 31 Dec 08 - 30 Dec 18
Assessment opinion Assessment opinion (2122 KB)
Revised PDD Revised PDD (290 KB)   Revised PDD - track changes (355 KB)
Supplementary documents Appendix 1 - 6. Investment analysis (modifications PDD) November-12 vf.xls (100 KB)
Appendix 2 - 7. Emission Reductions (modified PDD).xls (16 KB)
Signed form Signed form (86 KB)
DOE clarification
VVS version VVS 2.0
Current status 18 Sep 13 - Approved
Effective approval date: 13 Sep 13
Historic statuses 16 Jul 13 - Published
16 Jul 13 - Summary note being prepared
23 Aug 13 - Awaiting EB decision