00:34 28 Oct 25
Project:
0107 BII NEE STIPA
- Request for post-registration changes
| Project | 0107 BII NEE STIPA |
|---|---|
| PRC ref | PRC-0107-001 |
| Process track | Prior approval |
| DOE | TUV RHEIN |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Changes to the project or programme design
|
| Applicable crediting period | 31 Dec 08 - 30 Dec 18 |
| Assessment opinion |
Assessment opinion (2122 KB)
|
| Revised PDD |
Revised PDD (290 KB)
Revised PDD - track changes (355 KB)
|
| Supplementary documents |
Appendix 1 - 6. Investment analysis (modifications PDD) November-12 vf.xls (100 KB)
Appendix 2 - 7. Emission Reductions (modified PDD).xls (16 KB)
|
| Signed form | Signed form (86 KB) |
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 18 Sep 13 -
Approved
Effective approval date: 13 Sep 13
|
| Historic statuses |
16 Jul 13 -
Published 16 Jul 13 - Summary note being prepared 23 Aug 13 - Awaiting EB decision |

Assessment opinion
Appendix 1 - 6. Investment analysis (modifications PDD) November-12 vf.xls
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: