Project:
6488 Methane Capture and Utilization Project at Melewar Palm Oil Mill, Malaysia
- Request for post-registration changes
Project | 6488 Methane Capture and Utilization Project at Melewar Palm Oil Mill, Malaysia |
---|---|
PRC ref | PRC-6488-001 |
Process track | Prior approval |
DOE | Carbon Check |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
Change to the start date of the crediting period
|
Applicable crediting period | 24 Jun 16 - 23 Jun 26 |
Assessment opinion | Assessment opinion (790 KB) |
Revised PDD | Revised PDD (1049 KB) Revised PDD - track changes (1387 KB) |
Supplementary documents |
Appendix 1 - PRC_ex-ante ER_Melewar Mill Methane Recovery_WWT.xls (2259 KB)
|
Signed form | Signed form (6688 KB) |
DOE clarification | |
VVS version | VVS-PA 2.0 |
Current status | 28 Sep 20 -
Approved
Effective approval date: 27 Sep 20
|
Historic statuses |
24 Aug 20 -
Published 24 Aug 20 - Summary note being prepared 07 Sep 20 - Awaiting EB decision |