23:28 24 Jan 25
Project:
3555 Waste Heat Recovery based 15 MW Power Generation Project at Bestway Cement Limited, Chakwal, Pakistan
- Request for post-registration changes
Project | 3555 Waste Heat Recovery based 15 MW Power Generation Project at Bestway Cement Limited, Chakwal, Pakistan |
---|---|
PRC ref | PRC-3555-001 |
Process track | Prior approval |
DOE | TÜV SÜD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
Assessment opinion | Assessment opinion (350 KB) |
Revised PDD | |
Supplementary documents |
Appendix 1 - Doc 1 Heat Balance.pdf (48 KB)
Appendix 2 - Doc 2 flow diagram-Model.pdf (315 KB) Appendix 3 - Doc 3 Official confirmation of coal use.pdf (171 KB) Appendix 4 - Doc 4 Coal invoices (CDM).pdf (3791 KB) Appendix 5 - Doc 5 Coal invoices (July-Sept. 2009).pdf (1142 KB) |
Signed form | Signed form (1227 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 25 Feb 13 -
Approved
Effective approval date: 25 Feb 13
|
Historic statuses |
18 Dec 12 -
Published 18 Dec 12 - Summary note being prepared 04 Feb 13 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: