Project: 3555 Waste Heat Recovery based 15 MW Power Generation Project at Bestway Cement Limited, Chakwal, Pakistan - Request for post-registration changes
Project 3555 Waste Heat Recovery based 15 MW Power Generation Project at Bestway Cement Limited, Chakwal, Pakistan
PRC ref PRC-3555-001
Process track Prior approval
DOE TÜV SÜD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 28 Aug 2010 - 16 Jan 2012
Assessment opinion Assessment opinion (350 KB)
Revised PDD  
Supplementary documents Appendix 1 - Doc 1 Heat Balance.pdf (48 KB)
Appendix 2 - Doc 2 flow diagram-Model.pdf (315 KB)
Appendix 3 - Doc 3 Official confirmation of coal use.pdf (171 KB)
Appendix 4 - Doc 4 Coal invoices (CDM).pdf (3791 KB)
Appendix 5 - Doc 5 Coal invoices (July-Sept. 2009).pdf (1142 KB)
Signed form Signed form (1227 KB)
DOE clarification
VVS version VVS 2.0
Current status 25 Feb 13 - Approved
Effective approval date: 25 Feb 13
Historic statuses 18 Dec 12 - Published
18 Dec 12 - Summary note being prepared
04 Feb 13 - Awaiting EB decision