02:44 12 Nov 25
Project:
3555 Waste Heat Recovery based 15 MW Power Generation Project at Bestway Cement Limited, Chakwal, Pakistan
- Request for post-registration changes
| Project | 3555 Waste Heat Recovery based 15 MW Power Generation Project at Bestway Cement Limited, Chakwal, Pakistan |
|---|---|
| PRC ref | PRC-3555-001 |
| Process track | Prior approval |
| DOE | TÜV SÜD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
| Assessment opinion |
Assessment opinion (350 KB)
|
| Revised PDD | |
| Supplementary documents |
Appendix 1 - Doc 1 Heat Balance.pdf (48 KB)
Appendix 2 - Doc 2 flow diagram-Model.pdf (315 KB)
Appendix 3 - Doc 3 Official confirmation of coal use.pdf (171 KB)
Appendix 4 - Doc 4 Coal invoices (CDM).pdf (3791 KB)
Appendix 5 - Doc 5 Coal invoices (July-Sept. 2009).pdf (1142 KB)
|
| Signed form |
Signed form (1227 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 25 Feb 13 -
Approved
Effective approval date: 25 Feb 13
|
| Historic statuses |
18 Dec 12 -
Published 18 Dec 12 - Summary note being prepared 04 Feb 13 - Awaiting EB decision |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: