Project: 3404 Rwanda Electrogaz Compact Fluorescent Lamp (CFL) distribution project - Request for post-registration changes
Project 3404 Rwanda Electrogaz Compact Fluorescent Lamp (CFL) distribution project
PRC ref PRC-3404-001
Process track Prior approval
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 30 May 10 - 29 May 20
Assessment opinion Assessment opinion (712 KB)
Revised PDD Revised PDD (1246 KB)   Revised PDD - track changes (772 KB)
Supplementary documents Appendix 1 - Annex_ERs calculation_Rwanda_May2016.xls (70 KB)
Signed form Signed form (135 KB)
DOE clarification DOE clarification 1 - Validation Report PRC Rwanda CFL FINAL_160517.pdf (712 KB)
VVS version VVS 9.0
Current status 24 Jun 16 - Rejected
Effective rejection date: 21 Jun 16. Reason (108 KB)
Historic statuses 23 Feb 16 - Published
03 May 16 - Awaiting DOE clarifications
17 May 16 - DOE clarifications received
17 May 16 - Summary note being prepared
01 Jun 16 - Awaiting EB decision