06:03 09 Nov 24
Project:
0530 ARAPUtanga Centrais ELétricas S. A. - ARAPUCEL - Small Hydroelectric Power Plants Project
- Request for post-registration changes
Project | 0530 ARAPUtanga Centrais ELétricas S. A. - ARAPUCEL - Small Hydroelectric Power Plants Project |
---|---|
PRC ref | PRC-0530-003 |
Process track | Issuance |
DOE | KBS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 01 Sep 16 - 31 Aug 23 |
Assessment opinion | Assessment opinion (195 KB) |
Revised PDD | Revised PDD (1686 KB) Revised PDD - track changes (1690 KB) |
Supplementary documents |
Appendix 1 - ex-ante ER estimation -PRC_PDD.xlsx (58 KB)
|
Signed form | Signed form (118 KB) |
DOE clarification | |
VVS version | VVS-PA 3.0 |
Current status | 26 Jun 23 -
Approved
Effective approval date: 26 Jun 23
|
Historic statuses |
26 May 23 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: