17:30 26 Oct 25
Project:
0530 ARAPUtanga Centrais ELétricas S. A. - ARAPUCEL - Small Hydroelectric Power Plants Project
- Request for post-registration changes
| Project | 0530 ARAPUtanga Centrais ELétricas S. A. - ARAPUCEL - Small Hydroelectric Power Plants Project |
|---|---|
| PRC ref | PRC-0530-003 |
| Process track | Issuance |
| DOE | KBS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 01 Sep 16 - 31 Aug 23 |
| Assessment opinion |
Assessment opinion (195 KB)
|
| Revised PDD |
Revised PDD (1686 KB)
Revised PDD - track changes (1690 KB)
|
| Supplementary documents |
Appendix 1 - ex-ante ER estimation -PRC_PDD.xlsx (58 KB)
|
| Signed form |
Signed form (118 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 3.0 |
| Current status | 26 Jun 23 -
Approved
Effective approval date: 26 Jun 23
|
| Historic statuses |
26 May 23 -
Request published |

Assessment opinion
Appendix 1 - ex-ante ER estimation -PRC_PDD.xlsx
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: