02:53 11 Nov 25
Project:
5990 Inner Mongolia China Water Group Huade Sitaifangzi Wind Farm 49.5MW Project
- Request for post-registration changes
| Project | 5990 Inner Mongolia China Water Group Huade Sitaifangzi Wind Farm 49.5MW Project |
|---|---|
| PRC ref | PRC-5990-001 |
| Process track | Issuance |
| DOE | CTI Certification |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 16 Jul 12 - 15 Jul 22 |
| Assessment opinion |
Assessment opinion (157 KB)
|
| Revised PDD |
Revised PDD (964 KB)
Revised PDD - track changes (977 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (419 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 22 Dec 14 -
Approved
Effective approval date: 22 Dec 14
|
| Historic statuses |
21 Nov 14 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: