Project: 3702 Methane Recovery and Utilisation at PT Pinago Utama Sugihwaras Palm Oil Mill, Sumatera, Indonesia. - Request for post-registration changes
Project 3702 Methane Recovery and Utilisation at PT Pinago Utama Sugihwaras Palm Oil Mill, Sumatera, Indonesia.
PRC ref PRC-3702-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 09 Nov 2010 - 08 Feb 2012

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 09 Nov 10 - 08 Nov 17
Assessment opinion Assessment opinion (131 KB)
Revised PDD Revised PDD (518 KB)   Revised PDD - track changes (552 KB)
Supplementary documents Appendix 1 - Response 041012.xlsx (72 KB)
Appendix 2 - 8_Validation PRC_3702 Pinago_Request for Clarification_Approved_TC.pdf (148 KB)
Signed form Signed form (162 KB)
DOE clarification
VVS version VVS 2.0
Current status 13 Nov 12 - Approved
Effective approval date: 13 Nov 12
Historic statuses 18 Sep 12 - Published
25 Sep 12 - Awaiting DOE clarifications
08 Oct 12 - DOE clarifications received
08 Oct 12 - Summary note being prepared
23 Oct 12 - Awaiting EB decision