Project: 10331 Grid-connected Solar PV project in Bokhol - Request for post-registration changes
Project 10331 Grid-connected Solar PV project in Bokhol
PRC ref PRC-10331-001
Process track Prior approval
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on:
Applicable crediting period 11 Nov 16 - 10 Nov 23
Assessment opinion Assessment opinion (386 KB)
Revised PDD Revised PDD (1886 KB)   Revised PDD - track changes (2019 KB)
Supplementary documents Appendix 1 - 200525 CER Calculation revised.xlsx (3278 KB)
Signed form Signed form (126 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 08 Sep 20 - Approved
Effective approval date: 07 Sep 20
Historic statuses 03 Aug 20 - Published
03 Aug 20 - Summary note being prepared
18 Aug 20 - Awaiting EB decision