Project:
10331 Grid-connected Solar PV project in Bokhol
- Request for post-registration changes
Project | 10331 Grid-connected Solar PV project in Bokhol |
---|---|
PRC ref | PRC-10331-001 |
Process track | Prior approval |
DOE | Earthood |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 11 Nov 16 - 10 Nov 23 |
Assessment opinion | Assessment opinion (386 KB) |
Revised PDD | Revised PDD (1886 KB) Revised PDD - track changes (2019 KB) |
Supplementary documents |
Appendix 1 - 200525 CER Calculation revised.xlsx (3278 KB)
|
Signed form | Signed form (126 KB) |
DOE clarification | |
VVS version | VVS-PA 2.0 |
Current status | 08 Sep 20 -
Approved
Effective approval date: 07 Sep 20
|
Historic statuses |
03 Aug 20 -
Published 03 Aug 20 - Summary note being prepared 18 Aug 20 - Awaiting EB decision |