Project: 4828 Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited - Request for post-registration changes
Project 4828 Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited
PRC ref PRC-4828-001
Process track Prior approval
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 09 Sep 11 - 08 Sep 21
Assessment opinion Assessment opinion (815 KB)
Revised PDD Revised PDD (748 KB)   Revised PDD - track changes (778 KB)
Supplementary documents
Signed form Signed form (198 KB)
DOE clarification DOE clarification 1 - PRC Clarification response.pdf (507 KB)
VVS version VVS 2.0
Current status 17 Oct 13 - Approved
Effective approval date: 15 Oct 13
Historic statuses 13 Aug 13 - Published
27 Aug 13 - Awaiting DOE clarifications
10 Sep 13 - DOE clarifications received
10 Sep 13 - Summary note being prepared
24 Sep 13 - Awaiting EB decision