Project:
4828 Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited
- Request for post-registration changes
| Project | 4828 Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited |
|---|---|
| PRC ref | PRC-4828-001 |
| Process track | Prior approval |
| DOE | BVI |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 09 Sep 11 - 08 Sep 21 |
| Assessment opinion |
Assessment opinion (815 KB)
|
| Revised PDD |
Revised PDD (748 KB)
Revised PDD - track changes (778 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (198 KB)
|
| DOE clarification |
DOE clarification 1 - PRC Clarification response.pdf (507 KB)
|
| VVS version | VVS 2.0 |
| Current status | 17 Oct 13 -
Approved
Effective approval date: 15 Oct 13
|
| Historic statuses |
13 Aug 13 -
Published 27 Aug 13 - Awaiting DOE clarifications 10 Sep 13 - DOE clarifications received 10 Sep 13 - Summary note being prepared 24 Sep 13 - Awaiting EB decision |

Assessment opinion