Project:
5164 Nam Hong Hydropower Project
- Request for post-registration changes
Project | 5164 Nam Hong Hydropower Project |
---|---|
PRC ref | PRC-5164-001 |
Process track | Issuance |
DOE | DTSUS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
|
Applicable crediting period | 01 Jul 12 - 30 Jun 19 |
Assessment opinion | Assessment opinion (104 KB) |
Revised PDD | Revised PDD (601 KB) Revised PDD - track changes (2872 KB) |
Supplementary documents | |
Signed form | Signed form (391 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 15 Sep 14 -
Approved
Effective approval date: 15 Sep 14
|
Historic statuses |
15 Aug 14 -
Request published |