Project:
2285 Displacement of the electricity of the national electric grid by the auto-generation of renewable energy in the Caņaveralejo Wastewater Treatment Plant of EMCALI in Cali, Colombia
- Request for post-registration changes
Project | 2285 Displacement of the electricity of the national electric grid by the auto-generation of renewable energy in the Caņaveralejo Wastewater Treatment Plant of EMCALI in Cali, Colombia |
---|---|
PRC ref | PRC-2285-002 |
Process track | Prior approval |
DOE | ICONTEC |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 09 Sep 10 - 08 Sep 20 |
Assessment opinion | Assessment opinion (536 KB) |
Revised PDD | Revised PDD (1842 KB) Revised PDD - track changes (2201 KB) |
Supplementary documents | |
Signed form | Signed form (290 KB) |
DOE clarification | |
VVS version | VVS 7.0 |
Current status | 20 Oct 15 -
Approved
Effective approval date: 18 Oct 15
|
Historic statuses |
10 Sep 15 -
Published 10 Sep 15 - Summary note being prepared 28 Sep 15 - Awaiting EB decision |