Project: 2285 Displacement of the electricity of the national electric grid by the auto-generation of renewable energy in the Caņaveralejo Wastewater Treatment Plant of EMCALI in Cali, Colombia - Request for post-registration changes
Project 2285 Displacement of the electricity of the national electric grid by the auto-generation of renewable energy in the Caņaveralejo Wastewater Treatment Plant of EMCALI in Cali, Colombia
PRC ref PRC-2285-002
Process track Prior approval
DOE ICONTEC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 09 Sep 10 - 08 Sep 20
Assessment opinion Assessment opinion (536 KB)
Revised PDD Revised PDD (1842 KB)   Revised PDD - track changes (2201 KB)
Supplementary documents
Signed form Signed form (290 KB)
DOE clarification
VVS version VVS 7.0
Current status 20 Oct 15 - Approved
Effective approval date: 18 Oct 15
Historic statuses 10 Sep 15 - Published
10 Sep 15 - Summary note being prepared
28 Sep 15 - Awaiting EB decision