Project: 4734 CECIC Gansu Yumen Changma No.3 Wind Farm Project - Request for post-registration changes
Project 4734 CECIC Gansu Yumen Changma No.3 Wind Farm Project
PRC ref PRC-4734-001
Process track Prior approval
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 28 Apr 11 - 27 Apr 18
Assessment opinion Assessment opinion (177 KB)
Revised PDD Revised PDD (789 KB)   Revised PDD - track changes (684 KB)
Supplementary documents
Signed form Signed form (123 KB)
DOE clarification
VVS version VVS 2.0
Current status 23 Oct 12 - Approved
Effective approval date: 23 Oct 12
Historic statuses 20 Sep 12 - Published
20 Sep 12 - Summary note being prepared
02 Oct 12 - Awaiting EB decision