Project: 1134 ESTRE Pedreira Landfill Gás Project (EPLGP) - Request for post-registration changes
Project 1134 ESTRE Pedreira Landfill Gás Project (EPLGP)
PRC ref PRC-1134-003
Process track Prior approval
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Change a version of methodology
Methodology(ies) list ACM0001 ver. 19 - Flaring or use of landfill gas
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Increase in the capacity, Voluntary update of the applied methodologies to a later valid version or voluntary change to other methodologies
Applicable crediting period 12 Feb 15 - 11 Feb 22
Assessment opinion Assessment opinion (856 KB)
Revised PDD Revised PDD (3014 KB)   Revised PDD - track changes (3375 KB)
Supplementary documents Appendix 1 - ER Pedreira V 7.0 CP02 BELL CDM RCP 27522.xlsx (276 KB)
Signed form Signed form (256 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 04 Apr 23 - Approved
Effective approval date: 03 Apr 23
Historic statuses 27 Feb 23 - Published
27 Feb 23 - Summary note being prepared
14 Mar 23 - Awaiting EB decision