Project: 10006 Efficiency Improvement by Boiler Rehabilitation in fossil fuel-fired (Natural Gas) Steam Boiler System - Request for post-registration changes
Project 10006 Efficiency Improvement by Boiler Rehabilitation in fossil fuel-fired (Natural Gas) Steam Boiler System
PRC ref PRC-10006-001
Process track Prior approval
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: Actual operational parameters differ from the expected parameters Revisions to the eligibility criteria due to methodologies applied to the PoA are revised or replaced by the Board subsequent to being placed on hold
Applicable crediting period 01 Oct 14 - 30 Sep 24
Assessment opinion Assessment opinion (107 KB)
Revised PDD Revised PDD (1548 KB)   Revised PDD - track changes (2031 KB)
Supplementary documents Appendix 1 - ALBAYRONI ER (May-30-2016).xlsx (1667 KB)
Signed form Signed form (173 KB)
DOE clarification DOE clarification 1 - Validation Report for PRC_20160531.pdf (107 KB)
VVS version VVS 9.0
Current status 07 Jul 16 - Approved
Effective approval date: 05 Jul 16
Historic statuses 03 May 16 - Published
17 May 16 - Awaiting DOE clarifications
31 May 16 - DOE clarifications received
31 May 16 - Summary note being prepared
15 Jun 16 - Awaiting EB decision