11:08 27 Dec 24
Project:
10006 Efficiency Improvement by Boiler Rehabilitation in fossil fuel-fired (Natural Gas) Steam Boiler System
- Request for post-registration changes
Project | 10006 Efficiency Improvement by Boiler Rehabilitation in fossil fuel-fired (Natural Gas) Steam Boiler System |
---|---|
PRC ref | PRC-10006-001 |
Process track | Prior approval |
DOE | Earthood |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 01 Oct 14 - 30 Sep 24 |
Assessment opinion | Assessment opinion (107 KB) |
Revised PDD | Revised PDD (1548 KB) Revised PDD - track changes (2031 KB) |
Supplementary documents |
Appendix 1 - ALBAYRONI ER (May-30-2016).xlsx (1667 KB)
|
Signed form | Signed form (173 KB) |
DOE clarification |
DOE clarification 1 - Validation Report for PRC_20160531.pdf (107 KB)
|
VVS version | VVS 9.0 |
Current status | 07 Jul 16 -
Approved
Effective approval date: 05 Jul 16
|
Historic statuses |
03 May 16 -
Published 17 May 16 - Awaiting DOE clarifications 31 May 16 - DOE clarifications received 31 May 16 - Summary note being prepared 15 Jun 16 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: