Project: 9863 The MRTS PoA - Request for post-registration changes
Project 9863 The MRTS PoA
PRC ref PRC-9863-001
Process track Prior approval
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Change a version of methodology
Methodology(ies) list ACM0016 ver. 4 - Mass Rapid Transit Projects
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Changes to the project design as described in the registered generic CPA-DD

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: Revisions to the eligibility criteria due to methodologies applied to the PoA are revised or replaced by the Board subsequent to being placed on hold
Applicable crediting period 09 Oct 14 - 08 Oct 21
Assessment opinion Assessment opinion (487 KB)
Revised PDD Revised PDD (1515 KB)   Revised PDD - track changes (1628 KB)
Supplementary documents
Signed form Signed form (171 KB)
DOE clarification DOE clarification 1 - Revised PoA DDs.zip (2897 KB)
DOE clarification 2 - Revised Assessment Opinion.pdf (499 KB)
DOE clarification 3 - Clarification.pdf (460 KB)
VVS version VVS 9.0
Current status 09 Jun 17 - Approved
Effective approval date: 08 Jun 17
Historic statuses 10 Apr 17 - Published
24 Apr 17 - Awaiting DOE clarifications
06 May 17 - DOE clarifications received
06 May 17 - Summary note being prepared
19 May 17 - Awaiting EB decision