12:39 27 Dec 24
Project:
9863 The MRTS PoA
- Request for post-registration changes
Project | 9863 The MRTS PoA |
---|---|
PRC ref | PRC-9863-001 |
Process track | Prior approval |
DOE | KBS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
Change a version of methodology |
Methodology(ies) list |
ACM0016 ver. 4 -
Mass Rapid Transit Projects
|
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Changes to the project design as described in the registered generic CPA-DD
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 09 Oct 14 - 08 Oct 21 |
Assessment opinion | Assessment opinion (487 KB) |
Revised PDD | Revised PDD (1515 KB) Revised PDD - track changes (1628 KB) |
Supplementary documents | |
Signed form | Signed form (171 KB) |
DOE clarification |
DOE clarification 1 - Revised PoA DDs.zip (2897 KB)
DOE clarification 2 - Revised Assessment Opinion.pdf (499 KB) DOE clarification 3 - Clarification.pdf (460 KB) |
VVS version | VVS 9.0 |
Current status | 09 Jun 17 -
Approved
Effective approval date: 08 Jun 17
|
Historic statuses |
10 Apr 17 -
Published 24 Apr 17 - Awaiting DOE clarifications 06 May 17 - DOE clarifications received 06 May 17 - Summary note being prepared 19 May 17 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: