Project: 3982 Musa River 1st Level Small Hydropower Project - Request for post-registration changes
Project 3982 Musa River 1st Level Small Hydropower Project
PRC ref PRC-3982-001
Process track Issuance
DOE LRQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Jan 11 - 31 Dec 17
Assessment opinion Assessment opinion (251 KB)
Revised PDD Revised PDD (604 KB)   Revised PDD - track changes (1253 KB)
Supplementary documents
Signed form Signed form (90 KB)
DOE clarification
VVS version VVS 2.0
Current status 30 Jul 13 - Approved
Effective approval date: 30 Jul 13
Historic statuses 01 Jul 13 - Request published