08:21 09 Jan 25
Project:
3982 Musa River 1st Level Small Hydropower Project
- Request for post-registration changes
Project | 3982 Musa River 1st Level Small Hydropower Project |
---|---|
PRC ref | PRC-3982-001 |
Process track | Issuance |
DOE | LRQA |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 01 Jan 11 - 31 Dec 17 |
Assessment opinion | Assessment opinion (251 KB) |
Revised PDD | Revised PDD (604 KB) Revised PDD - track changes (1253 KB) |
Supplementary documents | |
Signed form | Signed form (90 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 30 Jul 13 -
Approved
Effective approval date: 30 Jul 13
|
Historic statuses |
01 Jul 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: