18:28 26 Jan 25
Project:
2184 Shuangqiao, Banqiao and Longtoushan Bundled Small Hydropower Project in Heilongjiang Province
- Request for post-registration changes
Project | 2184 Shuangqiao, Banqiao and Longtoushan Bundled Small Hydropower Project in Heilongjiang Province |
---|---|
PRC ref | PRC-2184-001 |
Process track | Issuance |
DOE | JCI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 31 Jul 09 - 30 Jul 16 |
Assessment opinion | Assessment opinion (1603 KB) |
Revised PDD | Revised PDD (471 KB) Revised PDD - track changes (534 KB) |
Supplementary documents | |
Signed form | Signed form (167 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 05 Apr 13 -
Approved
Effective approval date: 05 Apr 13
|
Historic statuses |
07 Mar 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: