Project: 2184 Shuangqiao, Banqiao and Longtoushan Bundled Small Hydropower Project in Heilongjiang Province - Request for post-registration changes
Project 2184 Shuangqiao, Banqiao and Longtoushan Bundled Small Hydropower Project in Heilongjiang Province
PRC ref PRC-2184-001
Process track Issuance
DOE JCI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 31 Jul 09 - 30 Jul 16
Assessment opinion Assessment opinion (1603 KB)
Revised PDD Revised PDD (471 KB)   Revised PDD - track changes (534 KB)
Supplementary documents
Signed form Signed form (167 KB)
DOE clarification
VVS version VVS 2.0
Current status 05 Apr 13 - Approved
Effective approval date: 05 Apr 13
Historic statuses 07 Mar 13 - Request published