14:31 10 Jan 25
Project:
2460 Tao River Ewuduo 12 MW Hydropower Project in Gansu Province, the People’s Republic of China
- Request for post-registration changes
Project | 2460 Tao River Ewuduo 12 MW Hydropower Project in Gansu Province, the People’s Republic of China |
---|---|
PRC ref | PRC-2460-001 |
Process track | Issuance |
DOE | ERM CVS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 07 Aug 09 - 06 Aug 16 |
Assessment opinion | Assessment opinion (376 KB) |
Revised PDD | Revised PDD (935 KB) Revised PDD - track changes (591 KB) |
Supplementary documents | |
Signed form | Signed form (128 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 11 Mar 13 -
Approved
Effective approval date: 11 Mar 13
|
Historic statuses |
08 Feb 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: