02:25 04 Jan 25
Project:
6095 Sustainable Small Hydropower Programme of Activities (PoA) in Viet Nam
- Request for post-registration changes
Project | 6095 Sustainable Small Hydropower Programme of Activities (PoA) in Viet Nam |
---|---|
PRC ref | PRC-6095-001 |
Process track | Prior approval |
DOE | KBS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
Applicable crediting period | 20 Aug 12 - 19 Aug 19 |
Assessment opinion | Assessment opinion (453 KB) |
Revised PDD | Revised PDD (901 KB) Revised PDD - track changes (1136 KB) |
Supplementary documents |
Appendix 1 - CPA 0003.zip (2501 KB)
Appendix 2 - CPA 0004.zip (1703 KB) Appendix 3 - CPA 0005.zip (1786 KB) Appendix 4 - CPA 0006.zip (1707 KB) |
Signed form | Signed form (38 KB) |
DOE clarification | |
VVS version | VVS-PA 1.0 |
Current status | 13 Dec 18 -
Approved
Effective approval date: 12 Dec 18
|
Historic statuses |
12 Nov 18 -
Published 12 Nov 18 - Summary note being prepared 22 Nov 18 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: