Project: 6095 Sustainable Small Hydropower Programme of Activities (PoA) in Viet Nam - Request for post-registration changes
Project 6095 Sustainable Small Hydropower Programme of Activities (PoA) in Viet Nam
PRC ref PRC-6095-001
Process track Prior approval
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Addition or change of technologies/measures with or without addition or change of applied methodologies
Applicable crediting period 20 Aug 12 - 19 Aug 19
Assessment opinion Assessment opinion (453 KB)
Revised PDD Revised PDD (901 KB)   Revised PDD - track changes (1136 KB)
Supplementary documents Appendix 1 - CPA 0003.zip (2501 KB)
Appendix 2 - CPA 0004.zip (1703 KB)
Appendix 3 - CPA 0005.zip (1786 KB)
Appendix 4 - CPA 0006.zip (1707 KB)
Signed form Signed form (38 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 13 Dec 18 - Approved
Effective approval date: 12 Dec 18
Historic statuses 12 Nov 18 - Published
12 Nov 18 - Summary note being prepared
22 Nov 18 - Awaiting EB decision