00:50 10 Nov 25
Project:
6095 Sustainable Small Hydropower Programme of Activities (PoA) in Viet Nam
- Request for post-registration changes
| Project | 6095 Sustainable Small Hydropower Programme of Activities (PoA) in Viet Nam |
|---|---|
| PRC ref | PRC-6095-001 |
| Process track | Prior approval |
| DOE | KBS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
| Applicable crediting period | 20 Aug 12 - 19 Aug 19 |
| Assessment opinion |
Assessment opinion (453 KB)
|
| Revised PDD |
Revised PDD (901 KB)
Revised PDD - track changes (1136 KB)
|
| Supplementary documents |
Appendix 1 - CPA 0003.zip (2501 KB)
Appendix 2 - CPA 0004.zip (1703 KB)
Appendix 3 - CPA 0005.zip (1786 KB)
Appendix 4 - CPA 0006.zip (1707 KB)
|
| Signed form |
Signed form (38 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 1.0 |
| Current status | 13 Dec 18 -
Approved
Effective approval date: 12 Dec 18
|
| Historic statuses |
12 Nov 18 -
Published 12 Nov 18 - Summary note being prepared 22 Nov 18 - Awaiting EB decision |

Assessment opinion
Revised PDD - track changes
Appendix 1 - CPA 0003.zip
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: