Project: 6283 Distribution of fuel-efficient improved cooking stoves in Nigeria - Request for post-registration changes
Project 6283 Distribution of fuel-efficient improved cooking stoves in Nigeria
PRC ref PRC-6283-004
Process track Renewal
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Combined with a request for renewal of crediting period (See footnote 2 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: Use of positive lists or related provisions is introduced or modified based on the valid version of approved tools pertaining to demonstration of additionality of small-scale or microscale project activities, Geographical boundary of the PoA is expanded within the host Party or to include one or more host Parties, A revision to the eligibility criteria pertaining to the demonstration of additionality
Applicable crediting period 07 Nov 19 - 06 Nov 26
Assessment opinion Assessment opinion (747 KB)
Revised PDD   Revised PDD - track changes (2364 KB)
Supplementary documents Appendix 1 - Nigeria PoA DD_version 15 (post I^0R check) clean.pdf (1235 KB)
Appendix 2 - 729_PRC PoA FVR_TC.pdf (760 KB)
Signed form Signed form (3453 KB)
DOE clarification
VVS version VVS-PoA 2.0
Current status 16 Dec 20 - Rejected
Effective rejection date: 15 Dec 20. The reason for rejection can be viewed as part of the final ruling for the associated request for issuance.
Historic statuses 02 Sep 20 - Request published