Project:
2672 Kitroongruang Biogas Energy Project
- Request for post-registration changes
| Project | 2672 Kitroongruang Biogas Energy Project |
|---|---|
| PRC ref | PRC-2672-001 |
| Process track | Prior approval |
| DOE | SIRIM |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 23 Oct 09 - 22 Oct 19 |
| Assessment opinion |
Assessment opinion (168 KB)
|
| Revised PDD |
Revised PDD (1056 KB)
Revised PDD - track changes (1074 KB)
|
| Supplementary documents |
Appendix 1 - KIT-PDD Calculation.xlsx (34 KB)
|
| Signed form |
Signed form (115 KB)
|
| DOE clarification | |
| VVS version | VVS 9.0 |
| Current status | 13 May 15 -
Approved
Effective approval date: 13 May 15
|
| Historic statuses |
08 Apr 15 -
Published 08 Apr 15 - Summary note being prepared 22 Apr 15 - Awaiting EB decision |

Assessment opinion
Appendix 1 - KIT-PDD Calculation.xlsx