Project: 2938 Power Prospect 9.9MW Rice Husk Power Plant - Request for post-registration changes
Project 2938 Power Prospect 9.9MW Rice Husk Power Plant
PRC ref PRC-2938-001
Process track Prior approval
DOE JQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 25 Feb 10 - 24 Feb 17
Assessment opinion Assessment opinion (455 KB)
Revised PDD Revised PDD (1970 KB)   Revised PDD - track changes (2006 KB)
Supplementary documents
Signed form Signed form (782 KB)
DOE clarification
VVS version VVS 2.0
Current status 18 Sep 13 - Approved
Effective approval date: 15 Sep 13
Historic statuses 13 Aug 13 - Published
13 Aug 13 - Summary note being prepared
26 Aug 13 - Awaiting EB decision