16:03 10 Nov 25
Project:
3677 Ekurhuleni Landfill Gas Recovery Project – South Africa
- Request for post-registration changes
| Project | 3677 Ekurhuleni Landfill Gas Recovery Project – South Africa |
|---|---|
| PRC ref | PRC-3677-002 |
| Process track | Renewal |
| DOE | Carbon Check |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
Change a version of methodology |
| Methodology(ies) list |
ACM0001 ver. 19 -
Flaring or use of landfill gas
|
| Standardized baseline(s) list | ASB0040-2018 ver. 01.0 - Standardized baseline: Grid emission factor for the Southern African power pool |
| DOE conducted validation of the changes | Combined with a request for renewal of crediting period (See footnote 2 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 26 Oct 17 - 25 Oct 24 |
| Assessment opinion |
Assessment opinion (655 KB)
|
| Revised PDD |
Revised PDD - track changes (1569 KB)
|
| Supplementary documents |
Appendix 1 - 615_3677_PRC VR_15.10.2020-track change.pdf (702 KB)
|
| Signed form |
Signed form (7705 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 2.0 |
| Current status | 08 Jan 21 -
Approved
Effective approval date: 08 Jan 21
|
| Historic statuses |
10 Dec 20 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: