Project: 3677 Ekurhuleni Landfill Gas Recovery Project – South Africa - Request for post-registration changes
Project 3677 Ekurhuleni Landfill Gas Recovery Project – South Africa
PRC ref PRC-3677-002
Process track Renewal
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Change a version of methodology
Methodology(ies) list ACM0001 ver. 19 - Flaring or use of landfill gas
Standardized baseline(s) list ASB0040-2018 ver. 01.0 - Standardized baseline: Grid emission factor for the Southern African power pool
DOE conducted validation of the changes Combined with a request for renewal of crediting period (See footnote 2 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 26 Oct 17 - 25 Oct 24
Assessment opinion Assessment opinion (655 KB)
Revised PDD   Revised PDD - track changes (1569 KB)
Supplementary documents Appendix 1 - 615_3677_PRC VR_15.10.2020-track change.pdf (702 KB)
Signed form Signed form (7705 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 08 Jan 21 - Approved
Effective approval date: 08 Jan 21
Historic statuses 10 Dec 20 - Request published