Project: 6204 Sichuan Province Yingxiongpo 56MW Hydropower Project - Request for post-registration changes
Project 6204 Sichuan Province Yingxiongpo 56MW Hydropower Project
PRC ref PRC-6204-001
Process track Issuance
DOE CCCI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 22 May 12 - 21 May 19
Assessment opinion Assessment opinion (349 KB)
Revised PDD Revised PDD (1119 KB)   Revised PDD - track changes (756 KB)
Supplementary documents
Signed form Signed form (143 KB)
DOE clarification
VVS version VVS 9.0
Current status 14 Apr 16 - Approved
Effective approval date: 14 Apr 16
Historic statuses 16 Mar 16 - Request published