Project:
4018 3.6MW Wind Power Project by M/s Hira Steels Ltd
- Request for post-registration changes
Project | 4018 3.6MW Wind Power Project by M/s Hira Steels Ltd |
---|---|
PRC ref | PRC-4018-001 |
Process track | Issuance |
DOE | KBS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
Assessment opinion | Assessment opinion (262 KB) |
Revised PDD | |
Supplementary documents |
Appendix 1 - Monitoring Report.pdf (146 KB)
Appendix 2 - ER Spreadsheet.xls (97 KB) |
Signed form | Signed form (1603 KB) |
DOE clarification | |
VVS version | VVS 7.0 |
Current status | 12 Jan 16 -
Approved
Effective approval date: 12 Jan 16
|
Historic statuses |
14 Dec 15 -
Request published |