Project: 4018 3.6MW Wind Power Project by M/s Hira Steels Ltd - Request for post-registration changes
Project 4018 3.6MW Wind Power Project by M/s Hira Steels Ltd
PRC ref PRC-4018-001
Process track Issuance
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 18 Jan 2011 - 31 Jan 2014
Assessment opinion Assessment opinion (262 KB)
Revised PDD  
Supplementary documents Appendix 1 - Monitoring Report.pdf (146 KB)
Appendix 2 - ER Spreadsheet.xls (97 KB)
Signed form Signed form (1603 KB)
DOE clarification
VVS version VVS 7.0
Current status 12 Jan 16 - Approved
Effective approval date: 12 Jan 16
Historic statuses 14 Dec 15 - Request published