Project: 10153 Chanju I Hydro Electric Project - Request for post-registration changes
Project 10153 Chanju I Hydro Electric Project
PRC ref PRC-10153-001
Process track Prior approval
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Change to the start date of the crediting period
  • Proposed start date of crediting period: 26 Jul 2017
Applicable crediting period 26 Jul 17 - 25 Jul 24
Assessment opinion Assessment opinion (150 KB)
Revised PDD Revised PDD (627 KB)   Revised PDD - track changes (636 KB)
Supplementary documents
Signed form Signed form (32 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 22 Feb 19 - Approved
Effective approval date: 17 Feb 19
Historic statuses 14 Jan 19 - Published
14 Jan 19 - Summary note being prepared
28 Jan 19 - Awaiting EB decision