13:27 26 Dec 24
Project:
6381 Ishasha 6.6 MW Small Hydropower Project
- Request for post-registration changes
Project | 6381 Ishasha 6.6 MW Small Hydropower Project |
---|---|
PRC ref | PRC-6381-002 |
Process track | Issuance |
DOE | Earthood |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 01 Jul 12 - 30 Jun 22 |
Assessment opinion | Assessment opinion (316 KB) |
Revised PDD | Revised PDD (1043 KB) Revised PDD - track changes (1137 KB) |
Supplementary documents | |
Signed form | Signed form (1243 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 07 Feb 17 -
Approved
Effective approval date: 07 Feb 17
|
Historic statuses |
09 Jan 17 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: