Project: 10122 6 MW Solar Power Project by Arhyama Solar Power - Request for post-registration changes
Project 10122 6 MW Solar Power Project by Arhyama Solar Power
PRC ref PRC-10122-001
Process track Issuance
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 13 Feb 15 - 12 Feb 22
Assessment opinion Assessment opinion (285 KB)
Revised PDD Revised PDD (745 KB)   Revised PDD - track changes (506 KB)
Supplementary documents
Signed form Signed form (255 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 22 Jul 22 - Approved
Effective approval date: 22 Jul 22
Historic statuses 23 Jun 22 - Request published