12:27 27 Dec 24
Project:
10122 6 MW Solar Power Project by Arhyama Solar Power
- Request for post-registration changes
Project | 10122 6 MW Solar Power Project by Arhyama Solar Power |
---|---|
PRC ref | PRC-10122-001 |
Process track | Issuance |
DOE | LGAI Tech. Center S.A |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 13 Feb 15 - 12 Feb 22 |
Assessment opinion | Assessment opinion (285 KB) |
Revised PDD | Revised PDD (745 KB) Revised PDD - track changes (506 KB) |
Supplementary documents | |
Signed form | Signed form (255 KB) |
DOE clarification | |
VVS version | VVS-PA 3.0 |
Current status | 22 Jul 22 -
Approved
Effective approval date: 22 Jul 22
|
Historic statuses |
23 Jun 22 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: