20:36 01 Nov 25
Project:
4118 Asahan 1 Hydroelectric Power Plant 2 x 90 MW
- Request for post-registration changes
| Project | 4118 Asahan 1 Hydroelectric Power Plant 2 x 90 MW |
|---|---|
| PRC ref | PRC-4118-006 |
| Process track | Issuance |
| DOE | KBS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
| Assessment opinion |
Assessment opinion (246 KB)
|
| Revised PDD | |
| Supplementary documents | |
| Signed form |
Signed form (151 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 2.0 |
| Current status | 29 Nov 21 -
Approved
Effective approval date: 29 Nov 21
|
| Historic statuses |
29 Oct 21 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: