Project: 2442 Guohua Dongying Lijin 49.5 MW Wind Farm Project (Phase 1) - Request for post-registration changes
Project 2442 Guohua Dongying Lijin 49.5 MW Wind Farm Project (Phase 1)
PRC ref PRC-2442-001
Process track Issuance
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 13 Jun 09 - 12 Jun 16
Assessment opinion Assessment opinion (114 KB)
Revised PDD Revised PDD (869 KB)   Revised PDD - track changes (1553 KB)
Supplementary documents
Signed form Signed form (357 KB)
DOE clarification
VVS version VVS 2.0
Current status 07 Mar 13 - Approved
Effective approval date: 07 Mar 13
Historic statuses 06 Feb 13 - Request published