11:43 27 Dec 24
Project:
10186 Accelerating Electrification through Grid Extension and Off-Grid Electrification in Rural Areas of Uganda
- Request for post-registration changes
Project | 10186 Accelerating Electrification through Grid Extension and Off-Grid Electrification in Rural Areas of Uganda |
---|---|
PRC ref | PRC-10186-004 |
Process track | Prior approval |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Inclusion of a monitoring plan in the registered PDD, PoA-DD or CPA-DD |
Applicable crediting period | 28 Aug 15 - 27 Aug 22 |
Assessment opinion | Assessment opinion (1037 KB) |
Revised PDD | Revised PDD (721 KB) Revised PDD - track changes (744 KB) |
Supplementary documents | |
Signed form | Signed form (54 KB) |
DOE clarification |
DOE clarification 1 - PRC10186-002_Response to Request for Clarification.pdf (178 KB)
DOE clarification 2 - CPA10186-0002_2019-03-13_PRC Assessment Report.pdf (929 KB) |
VVS version | VVS-PA 2.0 |
Current status | 23 Apr 19 -
Approved
Effective approval date: 18 Apr 19
|
Historic statuses |
25 Feb 19 -
Published 11 Mar 19 - Awaiting DOE clarifications 15 Mar 19 - DOE clarifications received 15 Mar 19 - Summary note being prepared 29 Mar 19 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: