Project: 10186 Accelerating Electrification through Grid Extension and Off-Grid Electrification in Rural Areas of Uganda - Request for post-registration changes
Project 10186 Accelerating Electrification through Grid Extension and Off-Grid Electrification in Rural Areas of Uganda
PRC ref PRC-10186-004
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Inclusion of a monitoring plan in the registered PDD, PoA-DD or CPA-DD
Applicable crediting period 28 Aug 15 - 27 Aug 22
Assessment opinion Assessment opinion (1037 KB)
Revised PDD Revised PDD (721 KB)   Revised PDD - track changes (744 KB)
Supplementary documents
Signed form Signed form (54 KB)
DOE clarification DOE clarification 1 - PRC10186-002_Response to Request for Clarification.pdf (178 KB)
DOE clarification 2 - CPA10186-0002_2019-03-13_PRC Assessment Report.pdf (929 KB)
VVS version VVS-PA 2.0
Current status 23 Apr 19 - Approved
Effective approval date: 18 Apr 19
Historic statuses 25 Feb 19 - Published
11 Mar 19 - Awaiting DOE clarifications
15 Mar 19 - DOE clarifications received
15 Mar 19 - Summary note being prepared
29 Mar 19 - Awaiting EB decision