21:43 28 Nov 24
Project:
0373 São João Landfill Gas to Energy Project (SJ)
- Request for post-registration changes
Project | 0373 São João Landfill Gas to Energy Project (SJ) |
---|---|
PRC ref | PRC-0373-001 |
Process track | Prior approval |
DOE | RINA |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
Change a version of methodology |
Methodology(ies) list |
ACM0001 ver. 18 -
Flaring or use of landfill gas
|
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 22 May 07 - 21 May 14 |
Assessment opinion | Assessment opinion (1018 KB) |
Revised PDD | Revised PDD (1628 KB) Revised PDD - track changes (2828 KB) |
Supplementary documents |
Appendix 1 - 20190606_São João_CERs_v.4.xlsx (205 KB)
Appendix 2 - 20190729_Enclosure 1_Rev3.xlsx (633 KB) Appendix 3 - 20190729_Enclosure 1_Rev3-original.xls (2244 KB) Appendix 4 - Appendix 3 - Enclosure 2 - actual_v.2.xls (83 KB) Appendix 5 - SJEA_Estimative Vs. Performed.xlsx (117 KB) |
Signed form | Signed form (174 KB) |
DOE clarification |
DOE clarification 1 - FVRP_2018BQ35MD_4_0Aa_02_10_2019_approved.pdf (1018 KB)
|
VVS version | VVS-PA 2.0 |
Current status | 13 Nov 19 -
Approved
Effective approval date: 12 Nov 19
|
Historic statuses |
08 Jul 19 -
Published 20 Sep 19 - Awaiting DOE clarifications 03 Oct 19 - DOE clarifications received 03 Oct 19 - Summary note being prepared 23 Oct 19 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: