17:13 28 Dec 24
Project:
10124 CDM Sustainable Energy Programme
- Request for post-registration changes
Project | 10124 CDM Sustainable Energy Programme |
---|---|
PRC ref | PRC-10124-002 |
Process track | Prior approval |
DOE | Earthood |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
Change a methodology (including addition of methodology(ies)) |
Methodology(ies) list |
AMS-II.G. ver. 9 -
Energy efficiency measures in thermal applications of non-renewable biomass
AMS-I.E. ver. 5 - Switch from non-renewable biomass for thermal applications by the user |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 19 Feb 15 - 18 Feb 22 |
Assessment opinion | Assessment opinion (605 KB) |
Revised PDD | Revised PDD (862 KB) Revised PDD - track changes (1198 KB) |
Supplementary documents |
Appendix 1 - 10124_ERs_Example_Comm.xlsx (169 KB)
Appendix 2 - PRCFORM.pdf (208 KB) |
Signed form | Signed form (117 KB) |
DOE clarification |
|
VVS version | VVS-PoA 2.0 |
Current status | 07 Aug 19 -
Approved
Effective approval date: 06 Aug 19
|
Historic statuses |
18 Mar 19 -
Published 28 Jun 19 - Awaiting DOE clarifications 12 Jul 19 - DOE clarifications received 12 Jul 19 - Summary note being prepared 17 Jul 19 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: