23:22 24 Jan 25
Project:
3503 Hebei Shengyuan Xuandong Coal Mine Methane Utilization Project
- Request for post-registration changes
Project | 3503 Hebei Shengyuan Xuandong Coal Mine Methane Utilization Project |
---|---|
PRC ref | PRC-3503-001 |
Process track | Prior approval |
DOE | BVI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 14 Jun 11 - 13 Jun 21 |
Assessment opinion | Assessment opinion (453 KB) |
Revised PDD | Revised PDD (1701 KB) Revised PDD - track changes (1777 KB) |
Supplementary documents |
Appendix 1 - Revised IRR NPV and emission reductions calculation spreadsheet.xls (332 KB)
|
Signed form | Signed form (50 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 09 Sep 13 -
Approved
Effective approval date: 22 Aug 13
|
Historic statuses |
09 Jul 13 -
Published 09 Jul 13 - Summary note being prepared 01 Aug 13 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: