Project: 3503 Hebei Shengyuan Xuandong Coal Mine Methane Utilization Project - Request for post-registration changes
Project 3503 Hebei Shengyuan Xuandong Coal Mine Methane Utilization Project
PRC ref PRC-3503-001
Process track Prior approval
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 14 Jun 11 - 13 Jun 21
Assessment opinion Assessment opinion (453 KB)
Revised PDD Revised PDD (1701 KB)   Revised PDD - track changes (1777 KB)
Supplementary documents Appendix 1 - Revised IRR NPV and emission reductions calculation spreadsheet.xls (332 KB)
Signed form Signed form (50 KB)
DOE clarification
VVS version VVS 2.0
Current status 09 Sep 13 - Approved
Effective approval date: 22 Aug 13
Historic statuses 09 Jul 13 - Published
09 Jul 13 - Summary note being prepared
01 Aug 13 - Awaiting EB decision