13:31 08 Nov 25
Project:
9741 Cabo Leones Wind Farm
- Request for post-registration changes
| Project | 9741 Cabo Leones Wind Farm |
|---|---|
| PRC ref | PRC-9741-002 |
| Process track | Prior approval |
| DOE | Earthood |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Changes to the project or programme design
Change to the start date of the crediting period
|
| Applicable crediting period | 12 Jun 18 - 11 Jun 25 |
| Assessment opinion |
Assessment opinion (505 KB)
|
| Revised PDD |
Revised PDD (2239 KB)
Revised PDD - track changes (2474 KB)
|
| Supplementary documents |
Appendix 1 - CABO LEONES_ER Calculation_ex ante.xlsx (219 KB)
Appendix 2 - 211112 IRR_Cabo Leones.xls (650 KB)
|
| Signed form |
Signed form (116 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 3.0 |
| Current status | 03 Feb 22 -
Approved
Effective approval date: 02 Feb 22
|
| Historic statuses |
27 Dec 21 -
Published 27 Dec 21 - Summary note being prepared 13 Jan 22 - Awaiting EB decision |

Assessment opinion
Appendix 1 - CABO LEONES_ER Calculation_ex ante.xlsx