Project:
5787 Punjab State Electricity Board: High Voltage Distribution System for Agricultural Consumers in the Rural Areas of the Punjab.
- Request for post-registration changes
Project | 5787 Punjab State Electricity Board: High Voltage Distribution System for Agricultural Consumers in the Rural Areas of the Punjab. |
---|---|
PRC ref | PRC-5787-002 |
Process track | Prior approval |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 13 Jul 12 - 12 Jul 19 |
Assessment opinion |
![]() |
Revised PDD |
![]() ![]() |
Supplementary documents |
![]() |
Signed form |
![]() |
DOE clarification |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() DOE clarification 9 - A4.a) 100 kVA LVDS transformer nameplate.jpg (903 KB) DOE clarification 10 - A4.b) 100 kVA LVDS transformer.jpg (1851 KB) ![]() ![]() DOE clarification 13 - Baseline condition schematic.jpg (65 KB) DOE clarification 14 - Project condition schematic.jpg (83 KB) |
VVS version | VVS-PoA 2.0 |
Current status | 07 Apr 20 -
Rejected
Effective rejection date: 05 Apr 20.
![]() |
Historic statuses |
07 Oct 19 -
Published 17 Dec 19 - Awaiting DOE clarifications 20 Dec 19 - DOE clarifications received 04 Mar 20 - Summary note being prepared 16 Mar 20 - Awaiting EB decision |