05:14 06 Jan 25
Project:
5787 Punjab State Electricity Board: High Voltage Distribution System for Agricultural Consumers in the Rural Areas of the Punjab.
- Request for post-registration changes
Project | 5787 Punjab State Electricity Board: High Voltage Distribution System for Agricultural Consumers in the Rural Areas of the Punjab. |
---|---|
PRC ref | PRC-5787-002 |
Process track | Prior approval |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 13 Jul 12 - 12 Jul 19 |
Assessment opinion | Assessment opinion (853 KB) |
Revised PDD | Revised PDD (1729 KB) Revised PDD - track changes (2139 KB) |
Supplementary documents |
Appendix 1 - Punjab HVDS PoA - CPA 01 Ver 5.xlsx (96 KB)
|
Signed form | Signed form (253 KB) |
DOE clarification |
DOE clarification 1 - 2019-11-04_Summary of response.pdf (357 KB)
DOE clarification 2 - Punjab HVDS PoA - CPA 01 Ver 5.1 TC.pdf (2148 KB) DOE clarification 3 - Punjab HVDS PoA - CPA 01 Ver 5.1 Clean.pdf (1735 KB) DOE clarification 4 - Punjab HVDS PoA - CPA 01 IRC.xlsx (95 KB) DOE clarification 5 - CPA1_PRC Assessment Report- IRC RESPONSE Rev.pdf (771 KB) DOE clarification 6 - F039_Punjab PoA_KR.pdf (287 KB) DOE clarification 7 - A1. Rajev Gandhi Rural Electrification guideline.pdf (719 KB) DOE clarification 8 - A2. Electricity supply instructions Manual PSPCL.PDF (2807 KB) DOE clarification 9 - A4.a) 100 kVA LVDS transformer nameplate.jpg (903 KB) DOE clarification 10 - A4.b) 100 kVA LVDS transformer.jpg (1851 KB) DOE clarification 11 - Consolidated-Supply-Code-2014-upto-4th-Amendment.pdf (2210 KB) DOE clarification 12 - S01-F039_Response_Punjab PoA_19Dec2019.pdf (338 KB) DOE clarification 13 - Baseline condition schematic.jpg (65 KB) DOE clarification 14 - Project condition schematic.jpg (83 KB) |
VVS version | VVS-PoA 2.0 |
Current status | 07 Apr 20 -
Rejected
Effective rejection date: 05 Apr 20.
Reason (69 KB)
|
Historic statuses |
07 Oct 19 -
Published 17 Dec 19 - Awaiting DOE clarifications 20 Dec 19 - DOE clarifications received 04 Mar 20 - Summary note being prepared 16 Mar 20 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform