03:06 09 Nov 25
Project:
5787 Punjab State Electricity Board: High Voltage Distribution System for Agricultural Consumers in the Rural Areas of the Punjab.
- Request for post-registration changes
| Project | 5787 Punjab State Electricity Board: High Voltage Distribution System for Agricultural Consumers in the Rural Areas of the Punjab. |
|---|---|
| PRC ref | PRC-5787-002 |
| Process track | Prior approval |
| DOE | TÜV NORD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 13 Jul 12 - 12 Jul 19 |
| Assessment opinion |
Assessment opinion (853 KB)
|
| Revised PDD |
Revised PDD (1729 KB)
Revised PDD - track changes (2139 KB)
|
| Supplementary documents |
Appendix 1 - Punjab HVDS PoA - CPA 01 Ver 5.xlsx (96 KB)
|
| Signed form |
Signed form (253 KB)
|
| DOE clarification |
DOE clarification 1 - 2019-11-04_Summary of response.pdf (357 KB)
DOE clarification 2 - Punjab HVDS PoA - CPA 01 Ver 5.1 TC.pdf (2148 KB)
DOE clarification 3 - Punjab HVDS PoA - CPA 01 Ver 5.1 Clean.pdf (1735 KB)
DOE clarification 4 - Punjab HVDS PoA - CPA 01 IRC.xlsx (95 KB)
DOE clarification 5 - CPA1_PRC Assessment Report- IRC RESPONSE Rev.pdf (771 KB)
DOE clarification 6 - F039_Punjab PoA_KR.pdf (287 KB)
DOE clarification 7 - A1. Rajev Gandhi Rural Electrification guideline.pdf (719 KB)
DOE clarification 8 - A2. Electricity supply instructions Manual PSPCL.PDF (2807 KB)
DOE clarification 9 - A4.a) 100 kVA LVDS transformer nameplate.jpg (903 KB) DOE clarification 10 - A4.b) 100 kVA LVDS transformer.jpg (1851 KB) DOE clarification 11 - Consolidated-Supply-Code-2014-upto-4th-Amendment.pdf (2210 KB)
DOE clarification 12 - S01-F039_Response_Punjab PoA_19Dec2019.pdf (338 KB)
DOE clarification 13 - Baseline condition schematic.jpg (65 KB) DOE clarification 14 - Project condition schematic.jpg (83 KB) |
| VVS version | VVS-PoA 2.0 |
| Current status | 07 Apr 20 -
Rejected
Effective rejection date: 05 Apr 20.
Reason (69 KB)
|
| Historic statuses |
07 Oct 19 -
Published 17 Dec 19 - Awaiting DOE clarifications 20 Dec 19 - DOE clarifications received 04 Mar 20 - Summary note being prepared 16 Mar 20 - Awaiting EB decision |

Assessment opinion
Appendix 1 - Punjab HVDS PoA - CPA 01 Ver 5.xlsx
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: