Project: 5787 Punjab State Electricity Board: High Voltage Distribution System for Agricultural Consumers in the Rural Areas of the Punjab. - Request for post-registration changes
Project 5787 Punjab State Electricity Board: High Voltage Distribution System for Agricultural Consumers in the Rural Areas of the Punjab.
PRC ref PRC-5787-002
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: Addition or change of technologies/measures with or without addition or change of applied methodologies
Applicable crediting period 13 Jul 12 - 12 Jul 19
Assessment opinion Assessment opinion (853 KB)
Revised PDD Revised PDD (1729 KB)   Revised PDD - track changes (2139 KB)
Supplementary documents Appendix 1 - Punjab HVDS PoA - CPA 01 Ver 5.xlsx (96 KB)
Signed form Signed form (253 KB)
DOE clarification DOE clarification 1 - 2019-11-04_Summary of response.pdf (357 KB)
DOE clarification 2 - Punjab HVDS PoA - CPA 01 Ver 5.1 TC.pdf (2148 KB)
DOE clarification 3 - Punjab HVDS PoA - CPA 01 Ver 5.1 Clean.pdf (1735 KB)
DOE clarification 4 - Punjab HVDS PoA - CPA 01 IRC.xlsx (95 KB)
DOE clarification 5 - CPA1_PRC Assessment Report- IRC RESPONSE Rev.pdf (771 KB)
DOE clarification 6 - F039_Punjab PoA_KR.pdf (287 KB)
DOE clarification 7 - A1. Rajev Gandhi Rural Electrification guideline.pdf (719 KB)
DOE clarification 8 - A2. Electricity supply instructions Manual PSPCL.PDF (2807 KB)
DOE clarification 9 - A4.a) 100 kVA LVDS transformer nameplate.jpg (903 KB)
DOE clarification 10 - A4.b) 100 kVA LVDS transformer.jpg (1851 KB)
DOE clarification 11 - Consolidated-Supply-Code-2014-upto-4th-Amendment.pdf (2210 KB)
DOE clarification 12 - S01-F039_Response_Punjab PoA_19Dec2019.pdf (338 KB)
DOE clarification 13 - Baseline condition schematic.jpg (65 KB)
DOE clarification 14 - Project condition schematic.jpg (83 KB)
VVS version VVS-PoA 2.0
Current status 07 Apr 20 - Rejected
Effective rejection date: 05 Apr 20. Reason (69 KB)
Historic statuses 07 Oct 19 - Published
17 Dec 19 - Awaiting DOE clarifications
20 Dec 19 - DOE clarifications received
04 Mar 20 - Summary note being prepared
16 Mar 20 - Awaiting EB decision