Project: 3549 Shankou Hydropower Project on Ningjiahe River in Xinjiang Uygur Autonomous Region, China - Request for post-registration changes
Project 3549 Shankou Hydropower Project on Ningjiahe River in Xinjiang Uygur Autonomous Region, China
PRC ref PRC-3549-001
Process track Issuance
DOE DTSUS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Mar 11 - 28 Feb 18
Assessment opinion Assessment opinion (111 KB)
Revised PDD Revised PDD (461 KB)   Revised PDD - track changes (470 KB)
Supplementary documents Appendix 1 - The front cover of the approved PDR.pdf (69 KB)
Signed form Signed form (401 KB)
DOE clarification
VVS version VVS 2.0
Current status 12 Mar 13 - Approved
Effective approval date: 12 Mar 13
Historic statuses 11 Feb 13 - Request published