Project: 1349 Montevideo Landfill Gas Capture and Flare Project - Request for post-registration changes
Project 1349 Montevideo Landfill Gas Capture and Flare Project
PRC ref PRC-1349-001
Process track Prior approval
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 02 Feb 10 - 01 Feb 17
Assessment opinion Assessment opinion (366 KB)
Revised PDD Revised PDD (1467 KB)   Revised PDD - track changes (1585 KB)
Supplementary documents Appendix 1 - LC.Urug.Montevideo.LFG.ERCal.(June 2013).xls (4222 KB)
Signed form Signed form (108 KB)
DOE clarification
VVS version VVS 2.0
Current status 07 Oct 13 - Approved
Effective approval date: 02 Oct 13
Historic statuses 27 Aug 13 - Published
27 Aug 13 - Summary note being prepared
11 Sep 13 - Awaiting EB decision