Project: 2867 Installation of Bundled Composting Project in the state of Tamil Nadu - Request for post-registration changes
Project 2867 Installation of Bundled Composting Project in the state of Tamil Nadu
PRC ref PRC-2867-002
Process track Issuance
DOE LRQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 17 Jan 10 - 16 Jan 20
Assessment opinion Assessment opinion (570 KB)
Revised PDD Revised PDD (2849 KB)   Revised PDD - track changes (3003 KB)
Supplementary documents
Signed form Signed form (251 KB)
DOE clarification
VVS version VVS 9.0
Current status 30 Sep 16 - Approved
Effective approval date: 30 Sep 16
Historic statuses 01 Sep 16 - Request published