Project: 7288 Gansu Jinchang Xitan Wind Farm Project - Request for post-registration changes
Project 7288 Gansu Jinchang Xitan Wind Farm Project
PRC ref PRC-7288-002
Process track Prior approval
DOE CQC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list ACM0002 ver. 13 - Consolidated baseline methodology for grid-connected electricity generation from renewable sources
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 06 Jan 13 - 05 Jan 20
Assessment opinion Assessment opinion (618 KB)
Revised PDD Revised PDD (2047 KB)   Revised PDD - track changes (2061 KB)
Supplementary documents
Signed form Signed form (3381 KB)
DOE clarification DOE clarification 1 - VR FORM-PRC-xitan-ver 03-final-clean.pdf (565 KB)
DOE clarification 2 - monitoring plan change PDD-Gansu Jinchang Xitan Wind Farm Project clean(version 05).pdf (2047 KB)

DOE clarification 4 - monitoring plan change PDD-Gansu Jinchang Xitan Wind Farm Project track(version 05).pdf (2061 KB)
VVS version VVS-PA 2.0
Current status 28 Jan 20 - Approved
Effective approval date: 27 Jan 20
Historic statuses 16 Dec 19 - Published
23 Dec 19 - Awaiting DOE clarifications
06 Jan 20 - DOE clarifications received
06 Jan 20 - Summary note being prepared
07 Jan 20 - Awaiting EB decision