Project: 1314 Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA) - Request for post-registration changes
Project 1314 Switching of fuel from coal to palm oil mill biomass waste residues at Industrial de Oleaginosas Americanas S.A. (INOLASA)
PRC ref PRC-1314-002
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 30 Nov 07 - 29 Nov 14
Assessment opinion Assessment opinion (551 KB)
Revised PDD Revised PDD (1705 KB)   Revised PDD - track changes (1566 KB)
Supplementary documents
Signed form Signed form (103 KB)
DOE clarification
VVS version VVS 2.0
Current status 24 Apr 14 - Approved
Effective approval date: 24 Apr 14
Historic statuses 26 Mar 14 - Request published