Project: 6439 Thac Xang Hydropower Project - Request for post-registration changes
Project 6439 Thac Xang Hydropower Project
PRC ref PRC-6439-001
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project design as described in the registered generic CPA-DD

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Apr 13 - 31 Mar 20
Assessment opinion Assessment opinion (456 KB)
Revised PDD Revised PDD (2687 KB)   Revised PDD - track changes (2831 KB)
Supplementary documents
Signed form Signed form (138 KB)
DOE clarification
VVS version VVS 2.0
Current status 15 Nov 16 - Approved
Effective approval date: 15 Nov 16
Historic statuses 17 Oct 16 - Request published