02:44 04 Jan 25
Project:
6439 Thac Xang Hydropower Project
- Request for post-registration changes
Project | 6439 Thac Xang Hydropower Project |
---|---|
PRC ref | PRC-6439-001 |
Process track | Issuance |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Changes to the project design as described in the registered generic CPA-DD
Corrections that do not affect project design
|
Applicable crediting period | 01 Apr 13 - 31 Mar 20 |
Assessment opinion | Assessment opinion (456 KB) |
Revised PDD | Revised PDD (2687 KB) Revised PDD - track changes (2831 KB) |
Supplementary documents | |
Signed form | Signed form (138 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 15 Nov 16 -
Approved
Effective approval date: 15 Nov 16
|
Historic statuses |
17 Oct 16 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: