05:57 23 Dec 24
Project:
0170 El Molle – Landfill gas (LFG) capture project
- Request for post-registration changes
Project | 0170 El Molle – Landfill gas (LFG) capture project |
---|---|
PRC ref | PRC-0170-003 |
Process track | Issuance |
DOE | RINA |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
Assessment opinion | Assessment opinion (450 KB) |
Revised PDD | |
Supplementary documents |
Appendix 1 - 9th Verification El Molle JAS_DEV_v2.xlsx (9516 KB)
Appendix 2 - EL MOLLE DEVIATION 14 07 2018 - 14 12 2020 Spreadsheet v2.xlsx (272 KB) Appendix 3 - NOVO El Molle_Consolidated 9th VER v2.xlsx (47 KB) Appendix 4 - El Molle 9th verification DEVIATION MR_v2_2021 06 21 JAS_clean_pos visita.pdf (760 KB) |
Signed form | Signed form (137 KB) |
DOE clarification | |
VVS version | VVS-PA 2.0 |
Current status | 16 Sep 21 -
Approved
Effective approval date: 16 Sep 21
|
Historic statuses |
18 Aug 21 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: