Project: 0170 El Molle – Landfill gas (LFG) capture project - Request for post-registration changes
Project 0170 El Molle – Landfill gas (LFG) capture project
PRC ref PRC-0170-003
Process track Issuance
DOE RINA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 14 Jul 2018 - 14 Dec 2020
Assessment opinion Assessment opinion (450 KB)
Revised PDD  
Supplementary documents Appendix 1 - 9th Verification El Molle JAS_DEV_v2.xlsx (9516 KB)
Appendix 2 - EL MOLLE DEVIATION 14 07 2018 - 14 12 2020 Spreadsheet v2.xlsx (272 KB)
Appendix 3 - NOVO El Molle_Consolidated 9th VER v2.xlsx (47 KB)
Appendix 4 - El Molle 9th verification DEVIATION MR_v2_2021 06 21 JAS_clean_pos visita.pdf (760 KB)
Signed form Signed form (137 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 16 Sep 21 - Approved
Effective approval date: 16 Sep 21
Historic statuses 18 Aug 21 - Request published