Project: 2710 Generation of electricity from 3.3 MW installed capacity wind mills by Mission Biofuels India Private Limited (MBIPL), in Sangli District, Maharashtra, India - Request for post-registration changes
Project 2710 Generation of electricity from 3.3 MW installed capacity wind mills by Mission Biofuels India Private Limited (MBIPL), in Sangli District, Maharashtra, India
PRC ref PRC-2710-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 20 Jan 10 - 19 Jan 20
Assessment opinion Assessment opinion (78 KB)
Revised PDD Revised PDD (350 KB)   Revised PDD - track changes (456 KB)
Supplementary documents
Signed form Signed form (170 KB)
DOE clarification
VVS version VVS 2.0
Current status 09 Sep 13 - Approved
Effective approval date: 08 Aug 13
Historic statuses 03 Jul 13 - Published
03 Jul 13 - Summary note being prepared
18 Jul 13 - Awaiting EB decision