16:57 07 Nov 25
Project:
9036 Khe Bo Hydropower Project
- Request for post-registration changes
| Project | 9036 Khe Bo Hydropower Project |
|---|---|
| PRC ref | PRC-9036-001 |
| Process track | Issuance |
| DOE | TUV RHEIN |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 12 May 13 - 11 May 23 |
| Assessment opinion |
Assessment opinion (1288 KB)
|
| Revised PDD |
Revised PDD (744 KB)
Revised PDD - track changes (786 KB)
|
| Supplementary documents |
Appendix 1 - Location confirmation letter.PDF (431 KB)
|
| Signed form |
Signed form (122 KB)
|
| DOE clarification | |
| Current status | 17 Apr 15 -
Approved
Effective approval date: 17 Apr 15
|
| Historic statuses |
19 Mar 15 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: