18:06 03 Feb 25
Project:
9036 Khe Bo Hydropower Project
- Request for post-registration changes
Project | 9036 Khe Bo Hydropower Project |
---|---|
PRC ref | PRC-9036-001 |
Process track | Issuance |
DOE | TUV RHEIN |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 12 May 13 - 11 May 23 |
Assessment opinion | Assessment opinion (1288 KB) |
Revised PDD | Revised PDD (744 KB) Revised PDD - track changes (786 KB) |
Supplementary documents |
Appendix 1 - Location confirmation letter.PDF (431 KB)
|
Signed form | Signed form (122 KB) |
DOE clarification | |
Current status | 17 Apr 15 -
Approved
Effective approval date: 17 Apr 15
|
Historic statuses |
19 Mar 15 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: