Project: 9036 Khe Bo Hydropower Project - Request for post-registration changes
Project 9036 Khe Bo Hydropower Project
PRC ref PRC-9036-001
Process track Issuance
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 12 May 13 - 11 May 23
Assessment opinion Assessment opinion (1288 KB)
Revised PDD Revised PDD (744 KB)   Revised PDD - track changes (786 KB)
Supplementary documents Appendix 1 - Location confirmation letter.PDF (431 KB)
Signed form Signed form (122 KB)
DOE clarification
Current status 17 Apr 15 - Approved
Effective approval date: 17 Apr 15
Historic statuses 19 Mar 15 - Request published