17:32 31 Oct 25
			
			
      Project:
      0889 RIMA Fuel Switch in Bocaiúva
      - Request for post-registration changes
    
					| Project | 0889 RIMA Fuel Switch in Bocaiúva | 
|---|---|
| PRC ref | PRC-0889-001 | 
| Process track | Issuance | 
| DOE | Earthood | 
| Methodology(ies) and/or Standardized Baseline(s) applied at the post-registration changes | No changes | 
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) | 
| Type of submission | Corrections that do not affect project design 
 | 
| Applicable crediting period | 10 Mar 07 - 09 Mar 17 | 
| Assessment opinion |  Assessment opinion (308 KB) | 
| Revised PDD |  Revised PDD (395 KB)  Revised PDD - track changes (420 KB) | 
| Supplementary documents | |
| Signed form |  Signed form (153 KB) | 
| DOE clarification | |
| VVS version | VVS-PA 3.0 | 
| Current status | 16 Jan 23 -
                      Approved 
              Effective approval date: 16 Jan 23
             | 
| Historic statuses | 16 Dec 22 -
                Request published | 

Offset now: visit the United Nations Carbon Offset Platform
Connect with us: