06:20 22 Dec 24
Project:
0889 RIMA Fuel Switch in Bocaiúva
- Request for post-registration changes
Project | 0889 RIMA Fuel Switch in Bocaiúva |
---|---|
PRC ref | PRC-0889-001 |
Process track | Issuance |
DOE | Earthood |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 10 Mar 07 - 09 Mar 17 |
Assessment opinion | Assessment opinion (308 KB) |
Revised PDD | Revised PDD (395 KB) Revised PDD - track changes (420 KB) |
Supplementary documents | |
Signed form | Signed form (153 KB) |
DOE clarification | |
VVS version | VVS-PA 3.0 |
Current status | 16 Jan 23 -
Approved
Effective approval date: 16 Jan 23
|
Historic statuses |
16 Dec 22 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: